I wanted to do a poll but it doesnt seem I can.
What do you prefer?
How many mainlines do you like?
(for average size layouts; like 4x8 size layouts)
I prefer two mainlines (my idea is one for passenger and 1 for freight, this is my dream layout:
http://www.thortrains.net/marx/ezho2a.gif
This one I believe will suit me perfectly.
What do you guys like?
What do you prefer?
How many mainlines do you like?
(for average size layouts; like 4x8 size layouts)
I prefer two mainlines (my idea is one for passenger and 1 for freight, this is my dream layout:
http://www.thortrains.net/marx/ezho2a.gif
This one I believe will suit me perfectly.
What do you guys like?
, i like two mainlines, and heres why: while running a train on the outside track continuous, you can do switching operations on the inside track, and vice versa, if your layout is set up for that. makes the layout busy with lots of train traffic:thumb:. just my thoughts