Made some progress this week...

vanda32547

New Member
Jun 4, 2002
193
0
71
Miami Florida
www.geocities.com
Hello Ya'll,

I made some progress this week on the new layout, but still have tons to do. I included a picture of the work in progress.

Regards,
 

Attachments

  • Layout082904(w).jpg
    Layout082904(w).jpg
    44.5 KB · Views: 120
Thanks for all the feedback...

Thanks for all the feedback. Having natural light is a nice thing ... except at night :D

Now lets talk about the grade... it is rather steep on the far right turn and I have to figure out a way to keep my track level coming around that tight 30" curve and platform bank on the far right near the window. I'm going from 0" to about 5 1/2" inches in the far left hand corner, with my homemade trestle, and then back down to 0" in the front portion of the layout.

I wanted to show some depth and height on this layout so the grade was determined by the space available to achieve my goal. I hope I won't be sorry with this decission. :confused: I have about 408 total inches to accomplish this in. I have been told that a grade should be a maximum of 1" rise for each 100"s so I guess my grade is a bit much.

As far as having trains running next weekend... :eek: I don't think so... I am still waiting for the release of the NEW MRC Prodigy Advance to run this railroad.

Regards,