Since the party is drawing to a close, I'll take the time and post a couple of finished photos.
First is of the LNE 0-8-0 switcher as it has stopped to take on water at the water tower. The engineer has gone over the call box to check in. One crew member is getting the water chute. And another crew member is leaning against the tender supervising.