Andy's Layout Update

Here's my latest up date. The track is all ballasted! The basis of the ground is almost done. I ran out of Woodland Senic rock and glue! Here's some pictures.

Enjoy,
Andy:wave:
 

Attachments

  • controls1.jpg
    controls1.jpg
    30.7 KB · Views: 77
  • layoutearth.jpg
    layoutearth.jpg
    24 KB · Views: 77
  • steampalor.jpg
    steampalor.jpg
    35 KB · Views: 78
Hi Ralph:

I ran into some problems with the signals. First they are Sunrise Enterprise signals. The owner has been sick for awhile and hasn't been making them for awhile. I am also using Atlas's snap relays to control them. I think I am going to switch over to Atlas's new signalling system. I did order a set of them today! For $100, I got 4 signals and currant sensors!:thumb:

Andy:wave:

http://www.atlasrr.com/trackmisc/nsignals.htm